SB-1314 - New Procedure for Installing Propellers

Issued in April 1973, this Johnson Service Bulletin explains a revised procedure for fitting propellers on outboards with thru-hub exhaust. The thrust bushing is fitted inside the propeller before the propeller is worked onto the shaft.

Johnson Outboards Service Bulletin letterhead
SB-#1314
April, 1973
SUBJECT: New Procedure for Installing Propellers
MODELS: All with thru-hub exhaust
We have learned of some cases where the positioning of the propeller hub in the propeller makes installation of the propeller on the thrust bushing difficult. We have found that if you place the thrust bushing in the propeller first, the propeller can be "worked" onto the shaft with little difficulty. If necessary, the propeller nut can be run down on the exposed thread and the propeller can be "wrenched" into position. The propeller shaft should turn freely (engine in neutral) after the propeller is installed. If it doesn't, the propeller is defective and should be replaced following regular warranty procedures.
Our tests have indicated that after a short period of operation the propeller and hub will align properly and future removal and instal- lation can be done with no difficulty.
Factory exploded view of propeller, thrust bushing, spacer, propeller nut, and cotter pin
JOHNSON OUTBOARDS
D. J. Leinonen Technical Data Coordinator
NOTE: Post on your 50 thru 135 H.P. under the heading "Lower Unit".